Mound Systems for On-site Wastewater Treatment

Siting, Design and Construction in Ohio

Bulletin 813


Mound System Design Example

Step 9. Determine Mound Sand Fill Upslope Depth.

The Ohio Household Sewage Rules require 4 feet of suitable soil for soil absorption systems. In this design example, the silt loam and sandy clay loam layers are considered suitable. The clay loam soil is not suitable due to its fine platy structure. The soil profile indicates 26 inches of suitable soil. The mound sand fill combined with the existing suitable soil must be at least 4 feet.

Mound Sand Fill Upslope Depth = (48 inches) - (Depth of Suitable Soil to Limiting Condition)

Mound Sand Fill Upslope Depth

Mound Sand Fill Upslope Depth:
Mound Sand Fill Upslope Depth = (48 inches) - (Depth of Suitable Soil to Limiting Condition)
= (48 inches) - (26 inches)
= 22 inches