Mound System Design Example

Step 8. Determine the Basal Width.

Basal Width = (Linear Loading Rate)/(Basal Loading Rate)

The basal width should be outlined on the site and protected from construction traffic and equipment. (Note: The basal width is normally less than the mound side widths, which are required to provide a mound side slope no steeper than 3:1.)

Distribution Area

Basal Width:
Basal Width = (Linear Loading Rate)/(Basal Loading Rate)
= (4 gpd/lf) /(0.6 gpd/ft2)
= 6.7 ft

The basal width is 6.7 - 4 = 2.7 feet wider than the distribution area width.