Ohio State University Extension Bulletin

Mound Systems for On-site Wastewater Treatment

Siting, Design and Construction in Ohio

Bulletin 813


Mound System Design Example

Step 6. Determine the Distribution Area Length.

Distribution Area Length = (Design Wastewater Loading Rate)/(Linear Loading Rate)

Distribution Area

Distribution Area Length:
Distribution Area Length = (Design Wastewater Loading Rate)/(Linear Loading Rate)
= (360 gpd)/(4 gpd/lf)
= 90 ft


Back | Forward | Table of Contents